工作测量,特别是时间研究,是工业工程和管理科学中的一个重要领域,它关注于精确测量和分析完成特定工作任务所需的时间。
Work measurement, particularly time study, is a crucial field in industrial engineering and management science. It focuses on precisely measuring and analyzing the time required to complete specific work tasks.
时间消耗结构
Time consumption structure
总时间 是完成一个工作任务所需的总时长,它包括了多个组成部分:
Total time is the total time required to complete a work task, which includes multiple components:
1、工作时间(Working hours)
作业时间:实际进行生产或操作的时间。
Operation time: the actual production or operation time.
宽放时间:为了保持工人效率而必须给予的额外时间,包括:
Time allowance: the additional time that must be given to maintain worker efficiency, including:
作业宽放:由于作业性质、环境条件等导致的额外时间。
Additional time due to the nature of the work and environmental conditions.
个人宽放:由于工人个人因素(如疲劳、个人习惯等)导致的额外时间。
Personal relaxation: extra time due to personal factors such as fatigue and personal habits.
疲劳宽放:为了补偿工人因长时间工作而产生的疲劳所需的时间。
Fatigue relief: The time needed to compensate for the fatigue of workers caused by long hours of work.
管理宽放:由于管理因素(如调度、监督等)导致的额外时间。
Management slack: Extra time due to management factors such as scheduling and supervision.
休息与生理需要时间:工人为了恢复体力和精神所需的短暂休息时间。
Rest and physiological needs time: The short rest time required by workers to restore physical and mental strength.
布置工作地时间:准备和整理工作场所所需的时间。
Time to set up the workspace: the time needed to prepare and organize the workspace.
准备与结束时间:开始和结束工作前所需的准备和收尾时间。
Preparation and completion time: The preparation and completion time required before starting and completing work.
1.2细致分类(Detailed classification)
基本工作时间是直接用于完成工作任务的时间,包括:
Basic working hours is the time directly used to complete work tasks, including:
产品设计缺陷工时消耗:由于产品设计不合理而导致的额外工作时间。
Product design defect man-hour consumption: additional working hours caused by unreasonable product design.
工艺过程缺陷工时消耗:由于工艺过程不完善而导致的额外工作时间。
Man-hour consumption due to defects in the process: additional working hours caused by imperfect processes.
2、无效时间(Invalid time)
管理不善:由于管理不当而导致的时间浪费。
Mismanagement: Waste of time due to poor management.
工人因素:由于工人技能不足、态度问题等原因导致的时间浪费。
Worker factors: time waste due to insufficient skills and attitude problems of workers.
今天的分享就到这里了,
如果您对文章有独特的想法,
欢迎给我们留言。
让我们相约明天,
祝您今天过得开心快乐!
That's all for today's sharing.
If you have a unique idea about the article,
please leave us a message,
and let us meet tomorrow.
I wish you a nice day!
翻译:百度翻译
参考资料:百度百科,
《生产运作管理》ISBN:9787111703570
本文由LearningYard新学苑整理并发出,如有侵权请后台留言沟通。
来源:浩轩教育